An excavator doesn't come to you. When it stops, a technician drives to a site, finds the site contact, checks the hazards, works out what's wrong and finds out whether the part is on the shelf or three days away. The machine runs on an hours meter, the job may stretch across weeks, and the customer wants to be invoiced as the work goes, not in one lump at the end.

Job tools built for a workshop bay assume the work happens in the bay. They don't have a place for a site address and its hazards, a way to charge travel by the vehicle that made the trip, or a way to bill a long job in stages. WSManager treats field work as a normal job, and puts what a technician needs on the phone in their pocket.

How WSManager fits an earthmoving workshop

Field jobs with the site details on the phone

When you create a job, choose Field (at the customer's site) instead of Workshop. Add the site address, the site contact, their phone and the Site hazards and PPE. They print on the job card and show on the technician's phone, with hazards and PPE at the top of the job and a Map link to the site.

A technician opens My jobs and sees Today and Upcoming cards for the jobs booked on them. A Site hazards flag shows on any job that has a hazards note. Customer and site contact numbers are tap-to-call.

Machines, hours and service intervals

Add a machine with its make, model, year, serial number or PIN and the customer's fleet number. Give it an hours meter and a service interval in hours. The technician records Meter out when the work is finished and, if the machine has an interval, the next service due is suggested from it.

Every job on the machine is in its Service history, newest first, so the next technician can see what was done on the last visit. If the machine is sold, transfer it to the new owner and its readings and history go with it.

Travel and mileage

Travel is its own kind of time. A technician selects Travel, chooses the vehicle, enters the km and taps the job they're heading to, then switches to Labour on arrival. In Settings, you give each vehicle a rate per km and, if you want one, a travel time rate per hour. The invoice carries a travel line for each vehicle and the mileage at that vehicle's rate.

Parts that have to be fetched

From the job on their phone, a technician selects Request a part to order and says what's needed, how many and by when. The office sees every request across all jobs in Parts to order, grouped by supplier. When parts are marked ordered, the job can move to Awaiting parts, and Bookings warns you if you book someone before the parts are due. As deliveries arrive, in full or in part, the people booked on the job are notified.

Progress claims on long jobs

On a job that runs for weeks, Create progress claim invoices what's been recorded and not yet invoiced while the job stays open. The draft lists the other invoices on the job so you can see what's been claimed, and the final invoice takes whatever is left, so nothing is charged twice. The Work in progress report shows the unbilled value on open jobs, at sell and at cost, as at any date.

What it doesn't do

  • It has no offline mode. Technicians need a signal to clock on, so a site without coverage is a limit.
  • It doesn't place purchase orders. You still order by phone, email or the supplier's portal, and purchase orders and bills stay in Xero.
  • It doesn't calculate pay. It exports approved hours, leave and public holidays for your payroll system.

FAQ

Can my technicians use it on site?

Yes, from their own phone in a browser, with nothing to install. They clock on, see their jobs, add parts, write notes and finish work from the phone, as long as they have signal.

Can I record a machine's hours and when it is next due?

Yes. A machine can have an hours meter, kilometres or both, with a service interval. You record the next service due as hours, km or a date, with a service type.

Can I invoice a big job in stages?

Yes. Progress claims invoice part of an open job. The final invoice takes everything not yet invoiced.

How do I charge for the trip out to site?

Travel is recorded with the vehicle and the km. Each vehicle has a rate per km and an optional travel time rate, and both go onto the invoice. Hours called out of normal hours are charged at your call-out rate.

Talk to us

Tell us how your field and workshop work fits together, and we'll show you WSManager on jobs like yours. Register your interest and we'll be in touch.